If ransomware or a server failure hit our engineering or architecture practice mid-project, how quickly could we get our drawings and project files back?

A practical guide to project file backup and recovery for Irish engineering and architecture practices: what affects restore speed, and why Microsoft 365 retention is not a backup.

The short answer: There is no single recovery time that fits every practice. How quickly you get drawings back depends on your project file backup and recovery setup. Does the backup include the live project store? How recent is the last good copy, and does it sit apart from the network? Large CAD and Revit files also take longer to restore than a typical Office document. Version history and Microsoft 365 retention are not a backup. The only honest test is a restore you have already run.

This guide is for small and mid-sized engineering and architecture practices in Meath, Cavan, Westmeath, Louth and Dublin. It covers project file backup and recovery after ransomware or a server failure mid-project. It does not cover remote access to CAD files, or the choice between SharePoint or a server.

What actually decides recovery speed

Nobody can honestly promise a set number of hours. The National Cyber Security Centre is plain on this in its advice for SMEs. Recovery time “is hugely dependent on several factors”. After all, those factors also apply after a failed server, not only after an attack. Those same questions sit at the heart of project file backup and recovery.

In practice, recovery speed usually turns on questions like these:

  • Is the live project store, not only email, included in the backup?
  • How much recent work could you lose, given how often copies are taken?
  • Does a usable copy sit apart from the office network?
  • How large are the models and drawing sets that have to come back?
  • Has anyone already restored a real project from that backup?
  • Is there a named person who knows the steps on the day?

The Data Protection Commission’s data security guidance is clear on recovery. It points to the ability to “restore the availability and access to personal data in a timely manner”. That applies “in the event of a physical or technical incident”. That is a duty to plan for, not a recovery time you can print on a proposal.

From our own work

We have worked with a business hit by ransomware. Recovery depended on a backup kept apart from the network, and on already knowing how a restore would run.

What project file backup and recovery must actually cover

Meanwhile, drawings and models are not like a short Word file. CAD and Revit files are large, often linked to other files, and they change many times in a day. Mid-project, people also leave files open, or keep a local copy on a laptop. A backup of the shared store will miss those copies unless you have already agreed one working location.

In addition, version history is useful when someone saves over a drawing by mistake. It is not a substitute for project file backup and recovery. Likewise, file locking and check-out help stop two people overwriting the same model. They do not bring the file back after ransomware or a disk failure. Our guide to remote access to CAD files covers locking and working copies in more detail. Check with your software vendor how it expects you to store and lock files.

Hypothetical example

An architecture practice in Navan keeps a live Revit model on an office server, with a copy in SharePoint. Staff treat version history as enough. After ransomware, both the server and the synced folders are unusable. Nobody has ever restored a large model from backup, so the first attempt happens mid-project.

Why Microsoft 365 retention is not a backup

However, many practices assume SharePoint, OneDrive or email retention will get them out of trouble. Microsoft describes retention settings as “designed for a long-term data lifecycle management strategy”. Their purpose is “to retain or delete data for compliance requirements”. That is a different job from project file backup and recovery. See Microsoft’s guidance on retention.

Microsoft also notes that a disaster-recovery copy “maintains the current state of content”. It does not keep “any historical versions from prior points in time”. Legal holds, it says, are “optimized for export (for example, via eDiscovery), not for mass restore”. You can read that in Microsoft’s backup frequently asked questions.

Even so, recycle bins and version history can still help with a single deleted file. They are a poor answer to ransomware across a whole project library. A separate Microsoft 365 backup covers email, OneDrive and SharePoint. It does not automatically cover files on a local server or a NAS. It also skips workstations and other practice systems. Where those files live is the starting point in our guide to SharePoint or a server for project files. In particular, that gap is why project file backup and recovery has to be planned, not assumed.

Servers, NAS and offsite copies for project file backup and recovery

Also, if live drawings sit on an office server or NAS, that system needs its own backup. Within our managed packages, device and server backup is scoped in a written proposal. The NCSC’s guidance for SMEs says a backup should be “kept separate to the original data”. It also says, “How often you need to back up will depend on how frequently your data changes.”

The same guidance asks firms to understand “the difference between cloud storage and cloud back-ups”. A cloud backup, it says, “creates a secure snapshot”. That snapshot is “a copy of your files and data at a particular point in time”. Equally, backups should sit “in a secure location, not directly connected to the business network”. On ransomware, the NCSC also advises “air-gapped or immutable storage”.

Finally, project file backup and recovery for a design practice often needs more than one place. Microsoft 365 backup, where you use SharePoint or OneDrive, is one part. A tested copy of the server or NAS is another, if the live models sit there.

Testing restores, and how we can help

After all, a backup you have never restored is only a hope. The NCSC also tells firms to “test your backups regularly”. Therefore, test a real project restore, not only a small Office file. Regular tests are what make project file backup and recovery real. Then note how long it took, and who did each step.

Oliver Sweeney founded the company in 1985. Today we support more than 50 businesses and more than 10 schools from Hurdlestown, Kells, Co. Meath. We help engineering and architecture practices plan project file backup and recovery across Microsoft 365, servers and devices. Our managed IT support packages start at Silver €49, Gold €69 and Diamond €89 per user per month, excluding VAT. Microsoft 365 licences are billed separately. Our post on IT support cost explains how backup fits into a managed package.

In addition, Gold includes email security, phishing awareness training and unlimited on-site call-outs. The helpdesk runs Monday to Friday, 9am to 5:30pm. After-hours emergency support costs extra. Silver includes Microsoft 365 backup. We restore-test backups every two weeks, and records are available on request.